The project consists of rehabilitation of Ada Boulevard bridge located within Edmonton’s River Valley. Scope of work includes demolition of existing elements from wingwalls, deck joints, bridge rails, South curb, and delamination repairs on abutments, backwalls and wingwalls. Project also includes pouring concrete for deck overlay, sidewalk and two concrete barriers across the span of the bridge. New bridge rails guard rails and light poles were installed. All Steel elements of the bridge were coated with new painting which required complete hoarding and containment.