This wasteway project for Alberta Transportation is located along the Belly River to St. Mary Reservoir Canal near Standoff, AB. CWP’s scope of work included 1,900 m3 of cast-in place concrete and associated formwork, installation of three radial gates and hoists and installation of a precast concrete vehicle bridge. This included 950 m2 of concrete placed on a 3H:1V slope. In addition CWP performed the concrete works on one downstream road crossing