This project consisted of the construction of two new concrete octagon shaped foundations. These foundations received 110 concrete pedestals consisting of 470 anchor bolt assemblies. In addition to the silo foundations, the contract also consisted of multiple smaller foundations for the new conveyors and truck scales. In total, 900m3 of concrete were poured and cured during the cold winter temperatures.