Consists of two bridges located in the Lake Louise Campground over the Bow river. The work consist of surface removal, partial depth concrete repairs on the deck curbs and underside of the bridge, deck waterproofing, paving, cleaning and sealing of curbs, abutment and piers, pressure injection of cracks in the underside of the girders.