The Manulife Place 2024 Parkade Repair Program involves replacing the underground cast iron piping system, upgrading the sump pump system, and installing new inline debris separator pits. The scope includes demolishing the existing slab-on-grade, excavating, removing, and replacing drainage infrastructure, backfilling, and recasting the slab. Several floor drains will also be replaced, along with other miscellaneous repairs to improve the parkade’s drainage system.
This project presents unique challenges due to the limited clearance within the parkade and the work taking place three floors below road grade. Careful planning and coordination are required to manage equipment, material handling, and logistics in the confined workspace.