This is CWP’s second bridge rehabilitation project with BCMOTI. The Summit Creek bridge is located on Highway 3, approximately 10 km West of Creston, BC. The bridge consists of a steel truss spanning between two concrete piers on either side of the river, steel girders, floor beams and diaphragms with a concrete bridge deck. The scope of work for this bridge rehabilitation included traffic accommodation, road surface removal, bridge deck concrete repairs, demolition of bridge deck overhangs, reconstruction of new overhangs complete with bridge parapets and bicycle parapet railings, installation of deck drains, deck joints replacement, steel truss modifications and coating, concrete deck overlay, roadway drainage improvements, approach asphalt paving and installation of concrete roadside barriers.