This is CWP’s first project with The City of Red Deer. The Taylor Drive Northbound bridge consists of five spans over the Red Deer River. The scope of work for this bridge rehabilitation includes construction of a temporary median cross-over detour, traffic accommodation, road surface removal, bridge deck concrete repairs, barrier concrete repairs, approach guardrail modifications, new bridge deck waterproofing and asphalt pavement system, substructure dry finishing and sealing, barrier dry finishing and sealing, deck drain modifications, pier stream gauge installation, the installation of a specialty hydrocarbon sensor assembly including piling and re-construction of the median.