CWP’s scope of work consisted of the construction of two 2 m tall octagonal tank foundations. Each of the 250 m3 foundations were designed to hold evaporator tanks for the Blackrod SAGD facility. This project also included setting cast in place anchor bolts and cold weather concrete curing.