Menaik Bridge Rehabilitation
Beverly Bridge Rehabilitation
This City of Edmonton project is for the rehabilitation of the Beverly Bridge on Yellowhead Trail Eastbound over the North Saskatchewan River. The scope of work for this project includes traffic accommodation, temporary scaffold work platforms, bridge deck concrete repairs, bridge deck resurfacing with waterproofing and asphalt, demolition and disposal of bridge barriers, new cast-in-place […]
Mount Revelstoke Bridge Rehabilitation
Pobokton Creek Bridge Rehabilitation
CWP Constructors is proud to partner with Parks Canada on the replacement of the Pobokton Creek Bridge along the Icefields Parkway (Hwy 93). The project includes bridge rehabilitation, roadway improvements, and enhanced safety features on this vital route between Jasper and Banff. Our work involves removing and rebuilding bridge components, installing precast concrete girders and […]
WID Canal Structures
This project for the Western Irrigation District consisted of a rehabilitation of an existing canal drop structure, a replacement of another canal drop structure and two new cast-in-place concrete canal drop structures. As the general contractor, CWP was responsible for the care of water, excavation, impervious clay backfill and the cast-in-place concrete works for each […]
Seebe Bridge Rehabilitation
This three span, two lane bridge rehabilitation project took place along Highway 1X over the Bow River. Scope of work included traffic accommodation, surface removal and replacement, partial and full depth concrete repairs, removal and replacement of 5 deck joints, pier and underside deck access, removal and replacement of approach slabs, HPC deck overlay with […]
Crowsnest Pass Bridge Rehabilitation
The single span, two-lane bridge rehabilitation took place along Highway 3 over the CPR tracks. Scope of work included traffic accommodation, surface removal and replacement, partial and full depth concrete repairs, removal and replacement of deck joints, underside deck access, void grouting of approach slabs, HPC deck overlay with steel fibers and transition paving.
Bullhorn Wasteway Replacement
This wasteway project for Alberta Transportation is located along the Belly River to St. Mary Reservoir Canal near Standoff, AB. CWP’s scope of work included 1,900 m3 of cast-in place concrete and associated formwork, installation of three radial gates and hoists and installation of a precast concrete vehicle bridge. This included 950 m2 of concrete […]
Athabasca River Bridge (West) Bridge Rehabilitation (Jasper National Park)
This three-span, two-lane bridge rehabilitation took place along Highway 16 in Jasper National Park over the Athabasca River. The scope of work included the removal and replacement of the concrete box girders and bearing pads. It also included modifications to the abutments and piers, removal and replacement of approach slabs, construction of a reinforced deck, […]
Snaring and Fiddle River Bridge Rehabilitation (Jasper National Park)
This contract contains two bridge rehabilitations along Highway 16 in Jasper National Park. The Fiddle River Bridge is a concrete girder three-span, two-lane bridge and the Snaring River Bridge is a concrete girder six-span, two-lane bridge. The scopes of work included concrete cold milling, deck overhang demo, and partial depth repairs to the deck as […]